PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed roof curbs at the high roof Facing West.jpg Sheathing around the skylight Facing East.jpg 2nd floor cmu block work Facing Wesr.jpg 2nd interior metal framing Facing East.jpg 4th interior metal framing Facing West (2).jpg 4th interior metal framing Facing West.jpg Duct work at the 4th floor Facing North.jpg Installed storm piping at the 4th floor Facing North.jpg Installing ductwork at the 4th floor Facing South.jpg
Previous pageNext page 4th interior metal framing Facing West (2)
4th interior metal framing Facing West (2)